Applied AI for infrastructure & enterprise operations · Dubai

Cut waste in the systems your city and company already run.

We build applied AI on the controllers, meters and records you already pay for: traffic signals, cooling plants, water networks, hospital approvals, construction contracts and customs.

Start with a 4-week offline audit (6 weeks in Health) at AED 0 upfront and zero access to your live systems.

Dubai FlowTraffic signalsThe next junction is full. Which light should turn green?

6 sectors · 11 programmes

Find your sector

Find the operating decision you want to test. Each programme sets out the evidence and the first trial.

Programme library

Two ways to start

Custom projects

Your operation

Have a costly recurring bottleneck outside these 11? In a four-week sprint on your own records, at AED 0 upfront, we size the problem and give you a test plan and the number we would sign for a pilot.

Start at AED 0

Water Sentinel Wastewater networks

Salt at the pumping station. Which pipe should crews check?

Two branches feed the same station. Water Sentinel compares their salinity readings to suggest where the crew should take its next sample.

Beneath a palm-lined Gulf street, two pipes discharge into a concrete sewer collector beside a pumping chamber.

Follow the investigation

Decision schematic, station alarm
Decision schematic

A signal downstream

Either branch could have carried the salt to the pump. The station reading alone leaves both routes open.

Tested on simulated salt inflows. On site, the crew would verify the suggested location with a field sample.

Build a water pilot brief
An overhead view of a city junction shows a queue approaching traffic lights and two vehicle paths through the crossing.

Dubai Flow Traffic signal optimisation

The next junction is full. Which light should turn green?

Dubai Flow’s AI checks the queue and the space beyond it. In simulation, engineers can see what happens when the cross street gets green instead.

Explore Dubai Flow

Illustrative signal timing

Compare the signal timing

The scheduled green opens while the next junction is still full. Green begins after the exit clears. The traffic team compares both timings before authorising a change.

Site Ledger Construction

Are we paying for the same materials twice?

Rebar paid for on delivery can appear again in the installation claim. Site Ledger flags the line so your quantity surveyor can check the earlier certificate before signing.

  1. Rebar paid on delivery
  2. Claimed again on installation
  3. Check the earlier certificate
Inspect Site Ledger
A site surveyor inspects a cast concrete wall beside exposed reinforcement and orange formwork.

The decision stays with people.

The model proposes. Each programme names who checks it.

  • Dubai FlowYour traffic engineers set the limits and review proposed changes in shadow mode.
  • Road ScanInspectors confirm defects and decide how to follow up.
  • Corridor EquilibriumOperators choose the guidance and compare test periods with normal operations.
  • Incident ZeroOfficers approve dispatches, road messages and incident reports.
  • Thermal BatteryYour operators approve every change.
  • Delta GuardYour facilities team verifies the cause on site and authorises any repair.
  • Gas ShieldQualified personnel inspect and act under the operator’s existing safety procedures.
  • Water SentinelField crews would verify each location with measurements on their own network.
  • Instant AuthCoders and clinicians check every suggestion and retain authority over coding and care.
  • Site LedgerThe surveyor resolves the item.
  • Trade ShieldA licensed customs professional reviews each file.
An operator stands beside a row of large chillers and silver insulated pipes in a sunlit district cooling plant.

Illustrative cooling study

Plant electricity demand

Current scheduleWith storage
Two plant schedules over the same summer day In this illustrative study, charging thermal storage overnight increases early demand. Using it in the afternoon lowers demand at the plant’s original peak.

Stored cooling reduces the electricity the plant draws at the afternoon peak.

Working with Nodal

Which decision would you test first?

Example decision
Can stored cooling serve one more building at peak demand?
Start at AED 0
  1. 01

    The decision

    Choose one site and the person who makes the call.

  2. 02

    How we would test it

    Together we agree what to measure and compare the proposed change with how that team works today.

  3. 03

    Evidence to date

    Each programme sets out the evidence and the first trial.

  4. 04

    A first step

    Describe one decision your team makes. Download a brief you can share with the person who would run the test.

Company

An applied AI company based in Dubai.

Consultancies sell five-year strategy decks. Model vendors sell generic chat seats. Nodal builds decision software on the equipment and records you already own, proves it offline before anything is switched on, and stays to maintain it.

Where we are

Seven programmes have simulation results that went through internal review: six held up with the wording shown here, and one, Instant Auth, did not pass in full. Four whose first tests did not hold are back in design. The reviews are internal: a separate AI session that did not write the code re-ran each result and tried to break it, and no outside reviewer has checked the figures yet. The next stage for a reviewed programme is a 4-week study on a partner's records, then a shadow pilot on live data.

Leadership

Santiago Collado

Founder & Chief Executive Officer

Dubai, UAE

Start at AED 0

Sovereign by default

  1. Built to run on your servers in the UAE

    On your premises or in your private cloud in the UAE. The first sprint needs zero credentials to your live systems.

  2. Source code in escrow

    Our proposed terms place the source code in escrow while Nodal maintains the engine.

  3. Your experts keep the decision

    Safety limits and the final decision stay with your engineer, clinician, quantity surveyor or customs agent.

Systems and standards the programmes are designed for

  • BACnet
  • Modbus
  • SCADA
  • UTC-UX Fusion
  • DHA eClaimLink
  • Oracle Aconex & Unifier
  • RIB Candy
  • SAP & Oracle ERP
  • Mirsal 2
  • FIDIC
  • RSB RD04b/RD10
  • IPMVP

Design targets, not integrations: nothing has run on a client's live system yet.

Independence

The programmes on this site are Nodal's own, designed from public information. Where a page names an authority or a company, it states a public fact and names its source. Nodal has no agreement with any organisation named here, and none of them has commissioned or endorsed a programme.

Questions & regulatory scope

Working with Nodal · Common executive questions

Designed to work with: BACnet · Modbus · SCADA · UTC-UX Fusion · DHA eClaimLink · Oracle Aconex & Unifier · RIB Candy · SAP/Oracle ERP · Mirsal 2 · FIDIC · IPMVP

What does Nodal build, and how is it different from an AI consultancy?

Consultancies deliver multi-year strategy decks and model vendors sell generic chat seats. Nodal builds and maintains decision software around one recurring operational cost on the equipment and records you already own, proven offline on your historical exports before anything is switched on.

What does the 4-week offline audit cost, and do you need access to our live systems?

The initial 4-week offline study (6 weeks for the hospital retrospective study) starts at AED 0 upfront and requires zero live logins or VPNs. Your team either processes read-only CSV/Excel exports on a machine inside your own UAE network or shares an agreed historical slice under mutual NDA. Later steps run on terms agreed after the study.

Where do Nodal systems run, and who keeps final operational authority?

Systems are built for sovereign deployment on your own premises or private cloud in the UAE, with our proposed terms placing source code in escrow. Your engineers, clinicians, quantity surveyors or licensed customs staff keep the safety limits and approve every operational decision.

Are Nodal's 11 programmes live in production today?

Not yet. Seven programmes are built and tested in simulation (six through internal review, plus Instant Auth whose fourth round closed with a partial pass and moves to a 6-week hospital study), and four programmes are in design with read-only audit engines ready for a first partner's historical exports.

A family holding hands on a zebra crossing of a palm-lined boulevard at golden hour, while two cars wait.