Put the tow crew where the next delay will hurt.

When a lane is blocked, the wait for a suitable recovery vehicle can dominate clearance time. Reconstruct where that wait starts across your corridors.

Incident Zero — Highway recovery staging & incident clearance audit

For a highway incident-management unit. In Dubai, that unit is run by RTA with Dubai Police and other agencies; Nodal has no agreement with any of them.

Today in the UAE

22,341 incidents

The Traffic Incident Management unit that RTA runs with Dubai Police and other agencies handled 22,341 incidents, including 9,391 vehicle-towing operations, from November 2022 to January 2024. It reported responding in about 6 minutes and clearing vehicles in 8 minutes on average (Dubai Media Office, 17 Mar 2024).

Proof to date

In design

In design: no simulation figure is published. An earlier simulation, on a highway corridor and an arterial street, is no longer used as proof: its gain came from sending a tow truck at dispatch whenever no camera had classified the vehicle, and a dispatcher applying that rule by hand matched it on the corridor. The design now is tow staging shift by shift and camera triage of whether a vehicle can be driven. The pilot target is agreed in writing beforehand.

How to start

4-week timestamp audit · AED 0 upfront

Read-only analysis of 12 months of incident, dispatch, arrival, clearance and towing timestamps across your corridors, on an anonymised extract you share. It shows where response, tow-wait and lane-clearance minutes are lost. No camera-network login. Anything later is on terms agreed after the study.

Limits

  • No pilot target has been agreed or signed yet. It would be fewer tow-arrival and lane-clearance minutes on towing incidents, against the corridor's own baseline, inside a ceiling on unneeded tows.
  • In the earlier simulation traffic was not calibrated, tow and patrol travel times were assumptions, and a tow truck was always available.
  • It read 9,391 towing operations in 22,341 incidents as the share of incidents that need a tow, a reading that is not verified. At lower shares no saving could be shown.
  • In that simulation the alert came no earlier than with today's automatic detection.
  • Tow staging across corridors and camera triage are designs, not yet tested. Staging is tested first on historical logs.
In Dubai, highway incident management is run by RTA & Dubai Police (no agreement with Nodal)

Inside the operating model.

Pilot design

What the first test must prove.

Start at AED 0

2-page executive brief (PDF) ↓1-page read-only CSV checklist (PDF) ↓

Incident Zero field verification
Illustrative image
The decision
Where should a fleet stand by for the next shift, and which reported incidents need a dispatcher to verify the recovery requirement?
How we would test it
Replay call, dispatch, arrival and clearance timestamps against the actual fleet available. Officers approve dispatches, road messages and incident reports.
Evidence & target
Stage: In design (no simulation figure is published). An earlier simulation on a five-lane highway and a three-lane arterial is no longer used as proof because its gain came from sending a tow truck at dispatch whenever no camera classified the vehicle — matched on the corridor by a dispatcher applying the same rule manually, with zero earlier alert. Current design focuses on shift-by-shift tow staging and camera driveability triage, with pilot targets agreed in writing beforehand.
A first step (AED 0 upfront)
4-week timestamp audit at AED 0 upfront on an anonymised 12-month extract of incident, dispatch, arrival, clearance and towing timestamps across your corridors (zero camera-network login; later steps on terms agreed after the study).

Questions & regulatory scope

Common questions · Incident Zero (Highway recovery staging & incident clearance audit)

Designed to work with: Incident, Dispatch, Arrival, Clearance & Towing Timestamps · Existing Corridor Cameras · Dynamic Signs

What does the 4-week timestamp audit measure?

By analysing 12 months of incident, dispatch, patrol-arrival, towing and lane-clearance timestamps across your corridors, it separates classification delays before tow dispatch from travel time tied to standby recovery crew positioning by shift.

Why is no simulation figure published for Incident Zero?

An earlier highway-and-arterial simulation relied on uncalibrated traffic, assumed travel times and a blanket tow-when-unclassified rule that a manual dispatcher matched on the corridor; shift-by-shift staging is therefore tested first on historical timestamp logs.

Who authorises dispatches and motorist warnings?

Control-room officers retain full authority over every dispatch, standby plan and dynamic road sign.