← Project library
Energy & coolingThermal Battery District cooling peak capacity & load shift

Can your plant serve the next tower?

A tower may need a new connection while your chillers are at their busiest. Test whether stored cooling can free enough capacity at the hour that matters.

Thermal Battery — District cooling peak capacity & load shift

For district-cooling providers with chilled-water storage

Today in the UAE

11.39 GW

DEWA's annual peak demand reached 11.39 GW in 2025, 5.83% above 2024 (Dubai Media Office, 10 Feb 2026). Empower alone had about 1.7 million RT of district cooling connected across 1,747 buildings. Electricity in Dubai is billed per kWh by monthly slab, with no charge for peak demand (Executive Council Resolution No. 16 of 2011).

Proof to date

Simulated, internal review

5.2%

In simulation, 28 typical Dubai buildings and two district-cooling districts with storage tanks had a 5.2% lower daily power peak (5.7 MW of 111 MW) than with thermostats fixed at 23 °C, over 16 summer weeks not used for tuning. A tuned timer managed 1.2% (1.3 MW) and was behind in all 16 weeks. From 13:30 to 17:30 the peak was 6.2% lower, against 3.9% for the timer.

How to start

4-week peak-release study · AED 0 upfront

15-minute trends under NDA: plant meters and tank logs from the provider, and BMS trends from building owners who agree. No SCADA or BMS login. The result is a megawatt range per type of summer day. Anything later is on terms agreed after the study.

Limits

  • The peak is the fleet's total electricity (chillers, fans and equipment), not plant cooling capacity, and the buildings are typical types, not real ones. Nothing has run in a real building.
  • Recharging moves demand to the evening: 6.0 MW above the 23 °C case on the weekly worst from 17:30 to 22:00 (timer: 2.6 MW), and 15 to 17 MW above it from 22:00 to midnight at worst in four re-run weeks.
  • The lead over a plant operator's own optimised tank schedule is not proven. Part of the gap to the timer comes from the timer's fixed tank schedule.
  • Each district is modelled as one agent that controls plant, tank and buildings, which in Dubai are separate parties.
  • Without the two districts and their tanks, the 28 buildings led the timer by 1.4 to 2.2 points in two re-run weeks.
  • The 16 weeks were not used for tuning, but an earlier version's results on them shaped the design that was tested.
  • Total electricity use fell only 0.16%. The contracted-capacity safeguard and measurement on alternating days are plans for a later pilot, not part of the 4-week study.
For district-cooling providers with chilled-water storage (Dubai's power grid is run by DEWA)

Inside the operating model.

Pilot design

What the first test must prove.

Start at AED 0

2-page executive brief (PDF) ↓1-page read-only CSV checklist (PDF) ↓

Thermal Battery field verification
Illustrative image
The decision
Can you commit capacity to another connection and keep existing customers comfortable on the hottest days?
How we would test it
Replay summer demand with your plant team. Compare a proposed charging schedule with your current one, including the extra demand when storage recharges. Your operators approve every change.
Evidence & target
Stage: Simulated, internal review. Across 28 typical Dubai buildings and two district-cooling districts with storage tanks over 16 summer weeks not used for tuning, daily fleet power peak fell 5.2% on average (5.7 MW of 111 MW) vs thermostats at 23 °C, ahead of a tuned timer's 1.2% (1.3 MW) in all 16 weeks (6.2% vs 3.9% in 13:30–17:30). Limits: fleet electricity (not cooling RT), total kWh fell only 0.16%, untested against an operator's own optimised tank schedule, 1.4–2.2 pt lead without tanks (2 re-run weeks), and tank recharge raised evening demand (+6.0 MW weekly worst 17:30–22:00; +15–17 MW worst 22:00–midnight in 4 re-run weeks).
A first step (AED 0 upfront)
4-week peak-release study at AED 0 upfront on 15-minute plant meter, tank and consenting-building BMS trends under NDA, with zero SCADA or BMS login. Later summer alternating-day testing (under an IPMVP plan) runs on terms agreed after the study.

Questions & regulatory scope

Common questions · Thermal Battery (District cooling peak capacity & load shift)

Designed to work with: Chilled-Water Storage Tanks · BACnet/IP & Modbus BMS · 15-Min Plant & Tank Trends · IPMVP Pilot Plan

What did Thermal Battery achieve in the 16-week summer simulation?

Across 28 typical buildings and two district-cooling districts with storage tanks over 16 summer weeks not used for tuning, it lowered the daily fleet electricity peak by 5.2% (5.7 MW of 111 MW) compared with 1.2% (1.3 MW) for a tuned timer, while not yet tested against an operator's own tank schedule.

Why is Thermal Battery aimed at district-cooling providers with storage tanks?

Because Dubai's slab electricity tariff (Resolution No. 16 of 2011) sets no peak-kW demand charge on ordinary building bills, and in simulation without chilled-water tanks the lead over a timer narrowed to 1.4–2.2 percentage points.

What happens to evening electricity demand when thermal tanks recharge?

Evening demand rises during recharge: up to 6.0 MW above the 23 °C baseline on the weekly worst between 17:30 and 22:00, and 15 to 17 MW between 22:00 and midnight at worst in four re-run weeks.